One of the most precious purposes humankind chases during all their lives is to leave a legacy behind. People, sometimes deliberately, sometimes unknowingly, endeavor to achieve this purpose for a lifetime. Raising a child to become a good person, building a school, planting a tree, writing a book or taking a photograph can immortalize a person.
Engineering is not only a profession but also a way to leave such precious legacy. The works one has built can be remembered along with creator’s name for decades, even for centuries. As Yüce Yapı, we take our heritage very seriously, with our passion for our profession and our technical expertise beyond standard engineering projects. And we are thrilled to have our signature on the tallest, longest and deepest works. We blend our experience with innovative ideas and deliver the best solutions end-to-end while focusing on our clients’ desire to create value.
We know our signature under numerous monumental projects all around Turkey is our heritage as well as our clients’. Yüce Yapı, celebrating its 16th anniversary in 2022, will continue to live through the trace it has left in all the projects it has taken and shall be taking part.
In every step of our projects, we will continue to add value to people’s lives, to chase our dreams and most important of all, to create works which will be passed onto next generations by our clients.
-
2006
Yüce Yapı established
-
2006
Works started as subcontractor in the scope of Marmaray Project
-
2008
Structural design works started
-
2011
First tunnel reinforced concrete works started with Marmaray Project, Sirkeci Station
-
2013
Yavuz Sultan Selim Bridge European Main Tower reinforced concrete construction started
-
2014
First steel fabrication started in the scope of Osmangazi Bridge Project
-
2014
Levent-Hisarüstü Metro Project works started with Alarko-Makyol JV
-
2015
Counter weight form traveller used for the first time in the scope of Yavuz Sultan Selim Bridge sidewalk reinforced concrete Works
-
2016
Üsküdar-Ümraniye-Çekmeköy Metro Çakmak Station passenger platform construction started
-
2016
Assemblies of Yavuz Sultan Selim Bridge expansion joints and pendulum bearing were done
-
2016
Yuce Yapı celebrated it's 10th anniversary
-
2017
The structure of refrigerant facility’s reinforced concrete of Çimko Cement Kahramanmaraş Narlı Factory was started
-
2018
1915 ÇANAKKALE (DARDANELLES) BRIDGE was started to build
-
2019
Akkuyu Nuclear Power Plant Reinforced Concrete Works were started
-
2019
EBD İnsaat Makine was established
-
2021
Yuce Yapı celebrated it's 15th anniversary