Levent – Hisarüstü Metro Project

Levent - Hisarüstü Metro Project

The contract has been signed by between Istanbul Metropolitan Municipality and Alarko-Makyol JV in December, 2012 as an EPC (Engineering, Procurement, and Construction).

Project Summary:

Project Name: Levent-Hisarüstü Metro Project

Client: Directorate of Rail System, Department of Transportation, Istanbul Metropolitan Municipality

Contractor: Alarko-Makyol JV

Line length: 4,7 km

Number of station: 4 (Underground)

Duration: 26 months

For the Levent – Hisarüstü subway line- one of the significant rail system projects of İstanbul, concrete lining of ventilation shaft and tunnel as well as the escape shaft and tunnel was produced by Yüce Yapı.

Yüce Yapı produced concrete lining of Escape shaft in 27 m height, Escape tunnel in 54 m length, Ventilation shaft in 35 m height and Ventilation tunnel in 69 m length.

Within the scope of this project, 230 ton rebar installation, 3050 m² elliptic climbing formwork assembly, 2770 m2 steel tunnel formwork assembly and 3650 m3 concrete casting, besides 1357m2 wooden formwork assembly and 3635 chemical anchoring was accomplished; also concrete inner structures of the escape and ventilation shafts were fabricated.